DOI: https://doi.org/10.46491/jp.v9i3

Published: Sep 30, 2024

FAKTOR-FAKTOR YANG MEMPENGARUHI OPTIMIZATION ENERGY SAVING IN LARGE AIRPORT TERMINAL: HVAC TECHNOLOGY, ECO AIRPORT SYSTEM DAN ENERGY MANAGEMENT AND CONTROL

261 - 276 Nabilah Hasna Arinda, Anas Syahra Putra, Direstu Amalia, M. Indra Martadinata, Sunardi Sunardi
42

Control, Digital Signage, remote OPTIMIZATION OF CONTROL AND MONITORING ON DIGITAL SIGNAGE BASED ON REMOTE DESKTOP AT I GUSTI NGURAH RAI AIRPORT, BALI

248 - 260 WIDI ARYANI PUTU, Sukarwoto Sukarwoto, Muhammad Caesar Akbar
1

MODIFIKASI MODUL SEQUENCE FLASHING LIGHT (SQFL) PADA BAR KE-21 DI BANDARA INTERNASIONAL HANG NADIM BATAM

233 - 247 Gerald Christ Mario Hutabarat, Muhammad Caesar Akbar
19

AERODROME CONTROL TOWER NOISE LEVEL at AJI PANGERAN TUMENGGUNG PRANOTO

222 - 232 Rayhan Almer Sa'adi Sa'adi, Imam Sonhaji
5

STANDARISASI PROSEDUR KOORDINASI ANTARA UNIT APP DAN TOWER DALAM MENGGUNAKAN SISTEM FREETEXT DI PERUM LPPNPI CABANG PONTIANAK

213 - 221 Ni Putu Tiara Saraswati, Surya Tri Saputra
1

MENGELOLA MANAJEMEN RISIKO MELALUI IDENTIFIKASI PROSES BISNIS DI BIDANG PENERBANGAN

199 -212 Agung Wahyu Wicaksono, Andi, Imam
37

ANALISIS PEMANDUAN TRAFFIC BIFA TERHADAP KELANCARAN KOMUNIKASI DI PERUM LPPNPI CABANG DENPASAR

189 - 198 Muhammad Nabil Wahid Zulfikar, Nunuk Praptiningsih
0

PERENCANAAN PENANGANAN LANJUT BERDASARKAN ANALISIS KERUSAKAN AREA PARKIR PENUMPANG TERMINAL PENUMPANG BANDAR UDARA DJALALUDDIN-GORONTALO DENGAN METODE PAVEMENT CONDITION INDEX (PCI) ASTM D6433-07

175 - 188 Wahyu Shesar Agustin, Linda Winiasri
27