Planning the Expansion of Ground Support Equipment Parking Using Rigid Pavement for the Next 10 Years at Juanda International Airport

Authors

  • Achmad Alfan Shafarruddin
  • Fahrur Rozi
  • Wiwid Suryono

Keywords:

Ground Support Equipment, Parking expansion, Rigid pavement, FAARFIELD, Juanda International Airport

Abstract

Juanda International Airport is projected to experience a significant increase in aircraft and domestic passenger
movements by 2035. This growth will impact the demand for Ground Support Equipment (GSE) parking, which
is expected to exceed the current capacity of 13,596 m2. This study aims to determine the required GSE parking
area during peak hours in 2035 using linear regression for traffic projections, SKEP.47/III/2007 for equipment
estimation, and the Ministry of Public Works Circular SE 02/SE/M/2018 for parking design standards. The
analysis results indicate a required parking area of 16,250 m2 and a rigid pavement thickness of 32.4 cm,
calculated using FAARFIELD 2.0.18. The estimated construction cost is Rp22,394,502,687.

Downloads

Published

2025-12-23

How to Cite

Alfan Shafarruddin, A. ., Rozi, . F. ., & Suryono, W. . (2025). Planning the Expansion of Ground Support Equipment Parking Using Rigid Pavement for the Next 10 Years at Juanda International Airport. Proceeding of International Conference of Advanced Transportation, Engineering, and Applied Social Science. Retrieved from https://ejournal.poltekbangsby.ac.id/index.php/icateass/article/view/2306