Helmi Aziz, Ghufran, Andi Patriadi, and Esti Wulandari. “Comparative Study on the Construction Time of Spun Pile and Bored Pile Foundations in Cohesive Soil: A Case Study of the Aqueduct X Project”. Proceeding of International Conference of Advanced Transportation, Engineering, and Applied Social Science (December 23, 2025). Accessed December 26, 2025. https://ejournal.poltekbangsby.ac.id/index.php/icateass/article/view/2305.